The construction of the second gravity-based structure (GBS 2) for the Arctic LNG 2 plant is over 80% complete, according to Maxim Mikhalev, the deputy head of GBS module integration ...
The construction of the second gravity-based structure (GBS 2) for the Arctic LNG 2 plant is over 80% complete, according to Maxim Mikhalev, the deputy head of GBS module integration ...
Tags: AlwaysFreeRegister,English,Gas,Russia and CIS
Published on April 10, 2023 4:03 PM (GMT+8)SHARE THIS STORY