  • Local, import offers were on an uptrend in January
  • Rupiah depreciation led to thin interest towards import cargoes during March
  • Coronavirus-induced economic downturn casts a shadow on Q2 market outlook

Local and import PE market in Indonesia began Q1 2020 with an upward trend. SSESSMENTS.COM data showed that local PE offers in Indonesia were on an uptrend during January. During this particular month, the leading Indonesian polyolefins producer made a total increment of between IDR1,660,000-1,950,000/ton ($105-123/ton) on HDPE grades and LLDPE Film C4 offers. Likewise, the local PE producer in the country increased offers by IDR700,000/ton ($44/ton) in January. However, some traders lowered offers for localized PE cargoes between IDR400,000-900,000/ton ($25-57/ton) on week-on-week comparison by the third and fourth week of January citing sour demand. In the import market, PE offers from Thai producers were hiked by $20-40/ton. Likewise, HDPE Blow Moulding from a Singaporean producer went up by $50/ton. Offers for HDPE Film and LLDPE Film C4 of US origin via traders also surged by $80/ton and $50-55/ton respectively. All changes in import offers were on a monthly comparison. For Middle Eastern cargoes, direct offers from the producers were scarce in January as most skipped offering amid the maintenance season.

Moving to February, PE prices in the Indonesia market started to decline. As SSESSMENTS.COM noted, the leading polyolefins producer in the country made a cumulative reduction on PE offers between IDR1,440,000-1,880,000/ton ($91-119/ton) during February, except for the week commencing February 24. Follow-suit, traders trimmed offers for local and localized cargoes between IDR500,000-1,100,000/ton ($32-70/ton) in February. From import, Middle Eastern LLDPE Film C4 cargoes dipped between $30-60/ton in February, but response towards the offers was cold due to shipment issue, particularly for Saudi cargoes. For Southeast Asian cargoes, a Thai producer made a total reduction of $50/ton on HDPE grades and $40/ton on LLDPE Film C4 offers in February, while offers for LDPE Film maintained stable due to tight supply amid maintenance shutdown.

In March, local and localized PE offers in the Indonesia market showed a mixed trend as sellers explored pricing strategy amid depreciation Rupiah against the US Dollar, SSESSMENTS.COM noted. In the first half of the month, the local producer’s offers maintained stable while some traders adjusted up offers for localized PE cargoes between IDR200,000-600,000/ton ($13-39/ton) as supported by Rupiah depreciation and relatively tight supply. However, buyers’ buy idea was very low, especially following the biggest drop in crude oil prices on March 9 stemming from Saudi-Russia’s price war. On March 11, a local converter expressed a buy idea for LLDPE Film C4 as low as IDR9,000,000/ton ($567/ton). In the third week, the leading polyolefins producer decreased local PE offers between IDR40,000-160,000 ($2.5-10/ton) from a week earlier. In contrast, traders adjusted up offers between IDR700,000-1,400,000/ton ($44-88/ton) compared to the same period. Moving to the final week, the leading Indonesian polyolefins producer increased PE offers between IDR620,000-930,000/ton ($39-57), while offers via traders surged by IDR100,000-1,000,000/ton ($6.3-63/ton), all on a weekly comparison. In the import market, HDPE Blow Moulding offers from Singapore maintained stable on a monthly comparison, but deals concluded at $30/ton lower than the initial level. Meanwhile, offers for Thai HDPE Film cargoes dropped drastically by $80-90/ton on a monthly comparison. For US cargoes, LLDPE Film C4 offers dipped by $20/ton as compared to the same period. Similarly, Middle Eastern producers lowered PE offers between $10-20/ton on a weekly basis. Despite the price cut, interest towards import cargoes remained thin as local offers were more competitive due to depreciation of Rupiah against the US Dollar.

Demand for PE resins in Indonesia reported quite healthy by the first half of January since firm offers from local and foreign suppliers succeed to trigger buyers to make procurements in anticipation of higher prices on the back of stronger crude oil prices stemming from US-Iran tension. However, by the third week of January, demand started to weaken following softer crude oil prices as US-Iran tension eased. Weak demand for PE resins persisted until the end of Q1 2020 as crude oil prices remained soft following Saudi-Russia’s oil price war, coupled with intensified Coronavirus outbreak in the country. On the supply side, availability of import PE cargoes was quite limited in January as some Middle Eastern producers skipped offering due to maintenance shutdown at their plants. In contrast, PE supply from Chandra Asri Petrochemical reportedly ample on the week commencing February 17 as the producer could not export cargoes to China amid Coronavirus outbreak. While in March, SSESSMENTS.COM was told that supply for LLDPE Film C4 in the domestic market was tight during the first half of the month.

On the production sector, Lotte Chemical Titan Nusantara’s HDPE plant no.2 with a capacity of 125,000 tons/year had resumed production on the week commencing January 6. Additionally, the producer’s LLDPE plant no.3 with a capacity of 200,000 tons/year was brought on-stream on January 18. Both plants were previously shut in the third week of December 2019 for commercial reasons. Meanwhile, Chandra Asri Petrochemical halted production at its 200,000 tons/year LLDPE plant and switched to produce HDPE grades on the week commencing February 10. Moreover, the producer utilized its 400,000 tons/year LLDPE plant to run a trial production for mLLDPE for two weeks starting from the week commencing March 9. In early March, Lotte Titan Nusantara experienced an unplanned shutdown at its 200,000 tons/year LLDPE plant and 125,000 tons/year HDPE plant. According to SSESSMENTS.COM’s supply and demand database, the plants were later brought on-stream on the week commencing March 16.

Looking into Q2, the majority of Indonesian market players predict that demand would remain on a negative side as most buyers would cease procurements and prefer a wait-and-see approach as uncertainties pile up stemming from volatile crude oil prices and Coronavirus outbreak. In terms of pricing outlook, some sources believe that there would not be any chances for local PE prices to increase further considering the weak demand, SSESSMENTS.COM was told.

Transactions for local/localized PE in January on FD Indonesia basis, excluding 10% VAT in all terms

OriginProductTransaction TypeOffers (IDR/ton)Equivalent in USD/tonPayment Term
IndonesiaHDPE Blow MouldingOffer Given14,000,000-14,500,000883-91430 Days Credit Term
IndonesiaHDPE Blow MouldingOffer Received14,200,000895Cash In Advance
IndonesiaHDPE Blow MouldingOffer Received14,000,000-14,900,000883-93930 Days Credit Term
IndonesiaHDPE Blow MouldingPrice List12,440,000-14,390,000784-907Cash In Advance
IndonesiaHDPE Blow MouldingPurchased14,400,000-14,600,000908-92030 Days Credit Term
SingaporeHDPE Blow MouldingOffer Given14,000,000-14,600,000883-92030 Days Credit Term
SingaporeHDPE Blow MouldingOffer Received14,100,000-15,100,000889-95230 Days Credit Term
Southeast AsiaHDPE Blow MouldingOffer Given13,600,000-14,800,000857-933Cash In Advance
Southeast AsiaHDPE Blow MouldingOffer Given13,900,000-14,700,000876-92714 Days Credit Term
Southeast AsiaHDPE Blow MouldingOffer Received14,200,000-14,500,000895-91430 Days Credit Term
Southeast AsiaHDPE Blow MouldingPurchased13,300,000839Cash In Advance
Southeast AsiaHDPE Blow MouldingSold13,800,000-14,000,000870-883Cash In Advance
ThailandHDPE Blow MouldingOffer Given14,100,000889Cash In Advance
ThailandHDPE Blow MouldingSell Idea14,500,000914Cash In Advance
IndonesiaHDPE FilmOffer Given13,700,000-14,450,000864-911Cash In Advance
IndonesiaHDPE FilmOffer Given13,680,000-14,800,000862-93330 Days Credit Term
IndonesiaHDPE FilmOffer Received13,000,000-14,700,000820-92730 Days Credit Term
IndonesiaHDPE FilmOffer Received12,800,000-14,200,000807-895Cash In Advance
IndonesiaHDPE FilmPrice List12,440,000-14,390,000784-907Cash In Advance
IndonesiaHDPE FilmPurchased13,800,000-14,000,000870-88330 Days Credit Term
IndonesiaHDPE FilmPurchased13,300,000-14,300,000839-902Cash In Advance
IndonesiaHDPE FilmSell Idea14,200,000-14,300,000895-90230 Days Credit Term
IndonesiaHDPE FilmSold13,600,000857Cash In Advance
MalaysiaHDPE FilmOffer Received13,500,000-14,500,000851-91430 Days Credit Term
MalaysiaHDPE FilmPurchased14,000,000-14,100,000883-88930 Days Credit Term
SingaporeHDPE FilmOffer Given14,500,000-14,600,000914-92030 Days Credit Term
SingaporeHDPE FilmOffer Received13,200,00083230 Days Credit Term
SingaporeHDPE FilmPurchased13,500,000-14,000,000851-88330 Days Credit Term
Southeast AsiaHDPE FilmOffer Given13,200,000-14,800,000832-933Cash In Advance
Southeast AsiaHDPE FilmOffer Given13,900,00087630 Days Credit Term
Southeast AsiaHDPE FilmOffer Given13,900,000-14,700,000876-92714 Days Credit Term
Southeast AsiaHDPE FilmOffer Received13,000,000-14,540,000820-91730 Days Credit Term
Southeast AsiaHDPE FilmOffer Received12,500,000-14,200,000788-895Cash In Advance
Southeast AsiaHDPE FilmPurchased13,150,00082930 Days Credit Term
Southeast AsiaHDPE FilmPurchased13,900,000876Cash In Advance
Southeast AsiaHDPE FilmSold13,800,000-14,000,000870-883Cash In Advance
ThailandHDPE FilmOffer Given12,520,000-14,100,000789-889Cash In Advance
ThailandHDPE FilmOffer Given13,400,000-13,500,000845-85130 Days Credit Term
ThailandHDPE FilmPurchased13,500,00085130 Days Credit Term
ThailandHDPE FilmSold13,200,00083230 Days Credit Term
ThailandHDPE FilmSold12,900,000-14,500,000813-914Cash In Advance
USAHDPE FilmPurchased13,000,000820Cash In Advance
IndonesiaHDPE Pipe (PE 100)Offer Given14,950,000943Cash In Advance
ThailandHDPE Pipe (PE 100)Offer Given14,800,000933Cash In Advance
MalaysiaLDPE FilmBid Given15,000,00094630 Days Credit Term
MalaysiaLDPE FilmBuy Idea15,500,00097720 Days Credit Term
MalaysiaLDPE FilmOffer Given15,300,000965Cash In Advance
MalaysiaLDPE FilmOffer Given15,300,000-16,000,000965-1,00930 Days Credit Term
MalaysiaLDPE FilmOffer Received15,500,000-16,000,000977-1,009Cash In Advance
MalaysiaLDPE FilmOffer Received15,000,000-16,000,000946-1,00930 Days Credit Term
MalaysiaLDPE FilmOffer Received15,500,00097720 Days Credit Term
MalaysiaLDPE FilmPurchased15,100,000-16,820,000952-1,06030 Days Credit Term
SingaporeLDPE FilmBid Given15,200,00095830 Days Credit Term
SingaporeLDPE FilmOffer Given15,300,000965Cash In Advance
SingaporeLDPE FilmOffer Received15,900,0001,00230 Days Credit Term
SingaporeLDPE FilmPurchased15,700,00099030 Days Credit Term
Southeast AsiaLDPE FilmOffer Given15,100,000-16,000,000952-1,009Cash In Advance
Southeast AsiaLDPE FilmOffer Given14,900,000-16,000,000939-1,00930 Days Credit Term
Southeast AsiaLDPE FilmOffer Given15,000,000946-97714 Days Credit Term
Southeast AsiaLDPE FilmOffer Received15,800,000996Cash In Advance
Southeast AsiaLDPE FilmOffer Received16,500,0001,04030 Days Credit Term
Southeast AsiaLDPE FilmSold14,700,000-15,800,000927-996Cash In Advance
ThailandLDPE FilmBid Given15,000,00094630 Days Credit Term
ThailandLDPE FilmOffer Given14,900,000-15,000,000939-94630 Days Credit Term
ThailandLDPE FilmOffer Given14,900,000-15,700,000939-990Cash In Advance
ThailandLDPE FilmOffer Received15,900,0001,00230 Days Credit Term
ThailandLDPE FilmSold14,900,00093930 Days Credit Term
ThailandLDPE FilmSold15,100,000-15,200,000952-958Cash In Advance
CanadaLLDPE Film C4Bid Given13,600,000857Cash In Advance
CanadaLLDPE Film C4Offer Received14,000,000883Cash In Advance
IndonesiaLLDPE Film C4Buy Idea12,800,00080730 Days Credit Term
IndonesiaLLDPE Film C4Buy Idea13,300,000839-857Cash In Advance
IndonesiaLLDPE Film C4Offer Given13,280,000837-93330 Days Credit Term
IndonesiaLLDPE Film C4Offer Given13,400,000845-914Cash In Advance
IndonesiaLLDPE Film C4Offer Received12,900,000813-90830 Days Credit Term
IndonesiaLLDPE Film C4Offer Received12,400,000782-902Cash In Advance
IndonesiaLLDPE Film C4Price List12,180,000768-908Cash In Advance
IndonesiaLLDPE Film C4Purchased12,900,000813-929Cash In Advance
IndonesiaLLDPE Film C4Purchased12,000,000757-91130 Days Credit Term
IndonesiaLLDPE Film C4Sold13,500,000851Cash In Advance
MalaysiaLLDPE Film C4Offer Received13,700,00086430 Days Credit Term
MalaysiaLLDPE Film C4Offer Received13,600,000857-912Cash In Advance
MalaysiaLLDPE Film C4Purchased13,780,000869Cash In Advance
Middle EastLLDPE Film C4Offer Received13,500,000851-864Cash In Advance
Middle EastLLDPE Film C4Purchased13,500,000851-864Cash In Advance
Southeast AsiaLLDPE Film C4Offer Given13,900,00087630 Days Credit Term
Southeast AsiaLLDPE Film C4Offer Given13,800,000870-92714 Days Credit Term
Southeast AsiaLLDPE Film C4Offer Given14,000,000883-920Cash In Advance
Southeast AsiaLLDPE Film C4Offer Received13,000,000820-91730 Days Credit Term
Southeast AsiaLLDPE Film C4Offer Received13,000,000820-895Cash In Advance
Southeast AsiaLLDPE Film C4Offer Received13,650,00086115 Days Credit Term
Southeast AsiaLLDPE Film C4Purchased14,360,00090530 Days Credit Term
Southeast AsiaLLDPE Film C4Purchased12,950,000816-839Cash In Advance
Southeast AsiaLLDPE Film C4Sold14,100,000889-920Cash In Advance
ThailandLLDPE Film C4Offer Given12,700,000801-905Cash In Advance
ThailandLLDPE Film C4Offer Received13,500,000851-86430 Days Credit Term
ThailandLLDPE Film C4Offer Received13,500,000851Cash In Advance
ThailandLLDPE Film C4Purchased12,750,000804Cash In Advance
ThailandLLDPE Film C4Purchased13,500,00085130 Days Credit Term
ThailandLLDPE Film C4Sold12,700,000801-876Cash In Advance
ThailandLLDPE Film C4Sold13,500,00085130 Days Credit Term
USALLDPE Film C4Offer Received13,850,000873Cash In Advance
USAmLLDPE C6Purchased13,000,00082030 Days Credit Term

Transactions for import PE in January on LC at sight, CIF/CFR Indonesia Main Port basis

OriginProductTransaction TypeOffers (USD/ton)
Southeast AsiaHDPE Blow MouldingBuy Idea880-940
Southeast AsiaHDPE Blow MouldingOffer Given910-1,070
Southeast AsiaHDPE Blow MouldingOffer Received920-970
Southeast AsiaHDPE Blow MouldingPrice List960
Southeast AsiaHDPE Blow MouldingSold980
Middle EastHDPE FilmBuy Idea800-900
Middle EastHDPE FilmOffer Given800-890
Middle EastHDPE FilmOffer Received780-890
Middle EastHDPE FilmPurchased780-820
North AmericaHDPE FilmBid Given830
North AmericaHDPE FilmBuy Idea800-820
North AmericaHDPE FilmOffer Given800-880
North AmericaHDPE FilmOffer Received840
North AmericaHDPE Film*Purchased780
Southeast AsiaHDPE FilmOffer Given910-1,040
Southeast AsiaHDPE FilmOffer Received910
Southeast AsiaHDPE FilmPrice List960
Southeast AsiaHDPE FilmSold980
Southeast AsiaHDPE Pipe (PE 100)Offer Given1,060-1,070
Middle EastHDPE Pipe Black (100)Offer Given1,020
Southeast AsiaHDPE Pipe Black (100)Offer Given970-990
Southeast AsiaHDPE YarnOffer Given910-940
Middle EastLDPE FilmOffer Given920
Middle EastLDPE FilmOffer Received900-960
Middle EastLDPE FilmSell Idea950-960
Southeast AsiaLDPE FilmBuy Idea920-930
Southeast AsiaLDPE FilmOffer Given1,000-1,120
Southeast AsiaLDPE FilmOffer Received950
Southeast AsiaLDPE FilmPrice List1,030-1,090
Far East AsiaLLDPE Film C4Offer Received950
Indian SubcontinentLLDPE Film C4Offer Given860-900
Indian SubcontinentLLDPE Film C4Offer Received828
Middle EastLLDPE Film C4Buy Idea870
Middle EastLLDPE Film C4Offer Given910
Middle EastLLDPE Film C4Offer Received860
Middle EastLLDPE Film C4Purchased840
Middle EastLLDPE Film C4Sold910
North AmericaLLDPE Film C4Offer Given840
North AmericaLLDPE Film C4Offer Received810
Southeast AsiaLLDPE Film C4Bid Given900
Southeast AsiaLLDPE Film C4Offer Given910
Southeast AsiaLLDPE Film C4Offer Received850
Southeast AsiaLLDPE Film C4Purchased910
North AmericamLLDPE C6*Offer Given850
North AmericamLLDPE C6*Offer Received960
North AmericamLLDPE C6*Purchased960
Southeast AsiamLLDPE C6Buy Idea1,070
Southeast AsiamLLDPE C6Offer Given1,050
Southeast AsiamLLDPE C6Offer Received1,070
North AmericamLLDPE C8**Offer Received1,010
North AmericamLLDPE C8**Purchased1,010
Southeast AsiamLLDPE C8Offer Received1,080
Southeast AsiamLLDPE C8Offer Received1,300
Description: *Shipment from Port Klang **Shipment from Singapore

Transactions for local/localized PE in February on FD Indonesia basis, excluding 10% VAT in all terms

OriginProductTransaction TypeOffers (IDR/ton)Equivalent in USD/tonPayment Term
IndonesiaHDPE Blow MouldingOffer Given13,800,000-13,900,000870-87614 Days Credit Term
IndonesiaHDPE Blow MouldingOffer Given13,500,000-14,200,000851-89530 Days Credit Term
IndonesiaHDPE Blow MouldingOffer Given13,000,000820Cash In Advance
IndonesiaHDPE Blow MouldingOffer Received13,100,000-14,500,000826-91430 Days Credit Term
IndonesiaHDPE Blow MouldingPrice List13,140,000-14,390,000828-907Cash In Advance
IndonesiaHDPE Blow MouldingPurchased13,500,00085130 Days Credit Term
IndonesiaHDPE Blow MouldingPurchased12,660,000798Cash In Advance
SingaporeHDPE Blow MouldingPurchased13,500,00085130 Days Credit Term
Southeast AsiaHDPE Blow MouldingOffer Given13,700,00086414 Days Credit Term
Southeast AsiaHDPE Blow MouldingOffer Given13,000,000-14,800,000820-933Cash In Advance
ThailandHDPE Blow MouldingOffer Given13,300,000-14,040,000839-885Cash In Advance
IndonesiaHDPE FilmBid Received13,000,000820Cash In Advance
IndonesiaHDPE FilmBuy Idea12,500,000788Cash In Advance
IndonesiaHDPE FilmOffer Given12,300,000-14,200,000775-895Cash In Advance
IndonesiaHDPE FilmOffer Given13,600,000-14,100,000857-88914 Days Credit Term
IndonesiaHDPE FilmOffer Given13,200,000-13,700,000832-86430 Days Credit Term
IndonesiaHDPE FilmOffer Received12,300,000-14,300,000775-90230 Days Credit Term
IndonesiaHDPE FilmOffer Received12,300,000-14,200,000775-895Cash In Advance
IndonesiaHDPE FilmPrice List13,070,000-14,390,000824-907Cash In Advance
IndonesiaHDPE FilmPurchased12,300,000-13,500,000775-851Cash In Advance
IndonesiaHDPE FilmPurchased13,000,000-14,200,000820-89530 Days Credit Term
MalaysiaHDPE FilmOffer Received12,900,000-13,200,000813-83230 Days Credit Term
MalaysiaHDPE FilmOffer Received12,800,000807Cash In Advance
MalaysiaHDPE FilmPurchased13,200,00083230 Days Credit Term
Southeast AsiaHDPE FilmOffer Given13,500,000-13,900,000851-87614 Days Credit Term
Southeast AsiaHDPE FilmOffer Given12,800,000-14,500,000807-914Cash In Advance
Southeast AsiaHDPE FilmOffer Received12,600,000-13,900,000794-876Cash In Advance
Southeast AsiaHDPE FilmOffer Received14,300,00090215 Days Credit Term
Southeast AsiaHDPE FilmOffer Received12,700,000-15,000,000801-94630 Days Credit Term
Southeast AsiaHDPE FilmPrice List12,900,000813Cash In Advance
Southeast AsiaHDPE FilmPurchased12,200,000-14,200,000769-895Cash In Advance
Southeast AsiaHDPE FilmPurchased13,300,000-13,900,000839-87630 Days Credit Term
ThailandHDPE FilmOffer Given13,300,000-14,100,000839-889Cash In Advance
ThailandHDPE FilmOffer Received13,200,00083230 Days Credit Term
ThailandHDPE FilmPurchased13,200,00083230 Days Credit Term
USAHDPE FilmOffer Received13,200,00083230 Days Credit Term
MalaysiaLDPE FilmBid Given14,500,000914Cash In Advance
MalaysiaLDPE FilmBuy Idea15,000,00094620 Days Credit Term
MalaysiaLDPE FilmOffer Given14,900,000939Cash In Advance
MalaysiaLDPE FilmOffer Received14,600,000-15,050,000920-94930 Days Credit Term
MalaysiaLDPE FilmOffer Received14,600,000-14,900,000920-939Cash In Advance
MalaysiaLDPE FilmPurchased15,500,00097720 Days Credit Term
MalaysiaLDPE FilmPurchased14,650,000-15,000,000924-94630 Days Credit Term
Southeast AsiaLDPE FilmOffer Given15,000,000-16,000,000946-1,009Cash In Advance
Southeast AsiaLDPE FilmOffer Given15,100,00095214 Days Credit Term
Southeast AsiaLDPE FilmOffer Received15,300,00096530 Days Credit Term
Southeast AsiaLDPE FilmOffer Received14,700,000927Cash In Advance
Southeast AsiaLDPE FilmPrice List15,200,000958Cash In Advance
ThailandLDPE FilmOffer Given14,800,000-15,600,000933-984Cash In Advance
ThailandLDPE FilmOffer Received15,500,000977Cash In Advance
ThailandLDPE FilmOffer Received15,200,00095830 Days Credit Term
CanadaLLDPE Film C4Bid Given11,800,000744Cash In Advance
CanadaLLDPE Film C4Buy Idea12,800,00080730 Days Credit Term
CanadaLLDPE Film C4Offer Received12,700,000-13,300,000801-83930 Days Credit Term
CanadaLLDPE Film C4Offer Received11,500,000-13,200,000725-832Cash In Advance
CanadaLLDPE Film C4Purchased12,800,000807Cash In Advance
IndonesiaLLDPE Film C4Bid Given11,800,000744Cash In Advance
IndonesiaLLDPE Film C4Buy Idea13,000,00082030 Days Credit Term
IndonesiaLLDPE Film C4Buy Idea12,000,000-13,450,000757-848Cash In Advance
IndonesiaLLDPE Film C4Offer Given12,000,000-14,200,000757-895Cash In Advance
IndonesiaLLDPE Film C4Offer Given13,350,000-14,200,000842-89514 Days Credit Term
IndonesiaLLDPE Film C4Offer Given12,800,000-13,700,000807-86430 Days Credit Term
IndonesiaLLDPE Film C4Offer Received11,700,000-13,640,000738-860Cash In Advance
IndonesiaLLDPE Film C4Offer Received12,000,000-13,800,000757-87030 Days Credit Term
IndonesiaLLDPE Film C4Price List12,800,00080730 Days Credit Term
IndonesiaLLDPE Film C4Price List12,800,000-14,400,000807-908Cash In Advance
IndonesiaLLDPE Film C4Purchased12,000,000-13,300,000757-839Cash In Advance
IndonesiaLLDPE Film C4Purchased12,000,000-14,180,000757-89430 Days Credit Term
IndonesiaLLDPE Film C4Sold12,500,000-12,800,000788-80730 Days Credit Term
MalaysiaLLDPE Film C4Offer Received12,500,000-13,200,000788-83230 Days Credit Term
MalaysiaLLDPE Film C4Offer Received12,800,000-13,300,000807-839Cash In Advance
MalaysiaLLDPE Film C4Purchased13,200,00083230 Days Credit Term
SingaporeLLDPE Film C4Offer Received13,500,00085130 Days Credit Term
Southeast AsiaLLDPE Film C4Buy Idea11,500,000725Cash In Advance
Southeast AsiaLLDPE Film C4Offer Given13,250,000-14,000,000835-88314 Days Credit Term
Southeast AsiaLLDPE Film C4Offer Given12,400,000-14,300,000782-902Cash In Advance
Southeast AsiaLLDPE Film C4Offer Received11,700,000-14,540,000738-917Cash In Advance
Southeast AsiaLLDPE Film C4Offer Received14,200,00089515 Days Credit Term
Southeast AsiaLLDPE Film C4Offer Received12,700,000-14,450,000801-91130 Days Credit Term
Southeast AsiaLLDPE Film C4Price List12,600,000794Cash In Advance
Southeast AsiaLLDPE Film C4Purchased11,900,000-13,640,000750-860Cash In Advance
Southeast AsiaLLDPE Film C4Purchased13,000,000-13,300,000820-83930 Days Credit Term
ThailandLLDPE Film C4Offer Given12,700,000-13,800,000801-870Cash In Advance
ThailandLLDPE Film C4Offer Received10,910,000-13,300,000688-839Cash In Advance
ThailandLLDPE Film C4Offer Received13,200,000-13,400,000832-84530 Days Credit Term
ThailandLLDPE Film C4Purchased13,200,000-13,300,000832-83930 Days Credit Term
USALLDPE Film C4Offer Received10,910,000688Cash In Advance
IndonesiamLLDPE C6Purchased13,000,000820Cash In Advance

Transactions for import PE in February on LC at sight, CIF Indonesia Main Port basis

OriginProductTransaction TypeOffers (USD/ton)
North AmericaHDPE Blow MouldingOffer Given850
Southeast AsiaHDPE Blow MouldingBid Given900
Southeast AsiaHDPE Blow MouldingOffer Given880-940
Southeast AsiaHDPE Blow MouldingOffer Received970
Southeast AsiaHDPE Blow MouldingPurchased900-950
Southeast AsiaHDPE Blow MouldingSell Idea1,000
Middle EastHDPE FilmBuy Idea820-870
Middle EastHDPE FilmOffer Given830-870
Middle EastHDPE FilmOffer Received830-900
Middle EastHDPE FilmPurchased890
Southeast AsiaHDPE FilmOffer Given880-1,000
Southeast AsiaHDPE FilmOffer Received930-940
Southeast AsiaHDPE YarnOffer Given880-940
Middle EastLDPE FilmOffer Given950-970
Middle EastLDPE FilmOffer Received910*-920
Southeast AsiaLDPE FilmOffer Given1,030-1,040
Central AsiaLLDPE Film C4Offer Received800
Indian SubcontinentLLDPE Film C4Offer Given850-870
Middle EastLLDPE Film C4Bid Given900
Middle EastLLDPE Film C4Buy Idea830-900
Middle EastLLDPE Film C4Offer Given840-920
Middle EastLLDPE Film C4Offer Received840-940
Middle EastLLDPE Film C4Purchased840-910
North AmericaLLDPE Film C4Bid Received870
North AmericaLLDPE Film C4Buy Idea800
North AmericaLLDPE Film C4Offer Given860-890
North AmericaLLDPE Film C4Offer Received835-885
North AmericaLLDPE Film C4Sell Idea920
Southeast AsiaLLDPE Film C4Bid Given800
Southeast AsiaLLDPE Film C4Offer Given830-940
Southeast AsiaLLDPE Film C4Offer Received830-940
Southeast AsiaLLDPE Film C4Purchased910-920
Southeast AsiaLLDPE Film C4Sold900
North AmericamLLDPE C6Offer Received1,175**
Description: *Re-export from China **Shipment from Singapore

Transactions for local/localized PE in March on FD Indonesia basis, excluding 10% VAT in all terms

OriginProductTransaction TypeOffers (IDR/ton)Equivalent in USD/tonPayment Term
IndonesiaHDPE Blow MouldingOffer Given13,300,00083914 Days Credit Term
IndonesiaHDPE Blow MouldingOffer Given13,200,000-14,400,000832-908Cash In Advance
IndonesiaHDPE Blow MouldingOffer Received13,400,000-14,250,000845-89830 Days Credit Term
IndonesiaHDPE Blow MouldingOffer Received13,450,000-13,700,000848-864Cash In Advance
IndonesiaHDPE Blow MouldingPrice List13,200,000-15,200,000832-958Cash In Advance
IndonesiaHDPE Blow MouldingPurchased13,200,000-15,000,000832-94630 Days Credit Term
MalaysiaHDPE Blow MouldingPurchased13,700,000864Cash In Advance
SingaporeHDPE Blow MouldingOffer Received13,300,00083930 Days Credit Term
Southeast AsiaHDPE Blow MouldingOffer Given13,300,00083914 Days Credit Term
Southeast AsiaHDPE Blow MouldingOffer Given13,200,000-14,400,000832-908Cash In Advance
Southeast AsiaHDPE Blow MouldingOffer Received13,800,00087030 Days Credit Term
ThailandHDPE Blow MouldingOffer Given13,180,000-14,690,000831-926Cash In Advance
IndonesiaHDPE FilmOffer Given13,210,000-15,200,000833-95830 Days Credit Term
IndonesiaHDPE FilmOffer Given13,200,000-13,300,000832-83914 Days Credit Term
IndonesiaHDPE FilmOffer Given12,500,000-14,400,000788-908Cash In Advance
IndonesiaHDPE FilmOffer Received12,800,000-13,700,000807-86430 Days Credit Term
IndonesiaHDPE FilmOffer Received12,450,000-14,700,000785-927Cash In Advance
IndonesiaHDPE FilmPrice List13,130,000-15,200,000828-958Cash In Advance
IndonesiaHDPE FilmPurchased13,200,000-14,910,000832-94030 Days Credit Term
IndonesiaHDPE FilmPurchased12,300,000-14,540,000775-917Cash In Advance
MalaysiaHDPE FilmOffer Received13,300,00083930 Days Credit Term
Southeast AsiaHDPE FilmOffer Given13,200,000-13,300,000832-83914 Days Credit Term
Southeast AsiaHDPE FilmOffer Given13,200,000-14,400,000832-908Cash In Advance
Southeast AsiaHDPE FilmOffer Received12,700,000-13,800,000801-870Cash In Advance
Southeast AsiaHDPE FilmOffer Received13,200,000-14,700,000832-92730 Days Credit Term
Southeast AsiaHDPE FilmPrice List14,400,000908Cash In Advance
Southeast AsiaHDPE FilmPurchased13,910,000-14,360,000877-90530 Days Credit Term
Southeast AsiaHDPE FilmPurchased13,200,000-13,300,000832-839Cash In Advance
ThailandHDPE FilmOffer Given13,180,000-14,690,000831-926Cash In Advance
ThailandHDPE FilmOffer Received14,700,00092730 Days Credit Term
ThailandHDPE FilmSold13,500,000851Cash In Advance
IndonesiaHDPE Pipe (PE 100)Price List14,450,000911Cash In Advance
MalaysiaLDPE FilmOffer Given14,540,000-16,700,000917-1,053Cash In Advance
MalaysiaLDPE FilmOffer Given15,100,000-15,200,000952-95814 Days Credit Term
MalaysiaLDPE FilmOffer Received14,800,000-16,500,000933-1,04030 Days Credit Term
MalaysiaLDPE FilmOffer Received14,650,000-16,700,000924-1,053Cash In Advance
MalaysiaLDPE FilmPurchased14,800,000-16,200,000933-1,02130 Days Credit Term
MalaysiaLDPE FilmPurchased14,500,000-15,500,000914-977Cash In Advance
SingaporeLDPE FilmOffer Given15,000,000946Cash In Advance
SingaporeLDPE FilmOffer Received15,000,000946Cash In Advance
SingaporeLDPE FilmOffer Received14,800,00093330 Days Credit Term
SingaporeLDPE FilmPurchased15,000,00094630 Days Credit Term
Southeast AsiaLDPE FilmOffer Given15,400,000971-99630 Days Credit Term
Southeast AsiaLDPE FilmOffer Given16,100,000-16,500,0001,015-1,040Cash In Advance
Southeast AsiaLDPE FilmOffer Received15,000,000-16,500,000946-1,040Cash In Advance
Southeast AsiaLDPE FilmOffer Received15,700,000-16,000,000990-1,00930 Days Credit Term
Southeast AsiaLDPE FilmOffer Received15,500,00097715 Days Credit Term
Southeast AsiaLDPE FilmPrice List16,200,0001,021Cash In Advance
Southeast AsiaLDPE FilmPurchased15,500,00097730 Days Credit Term
Southeast AsiaLDPE FilmPurchased14,750,000930Cash In Advance
ThailandLDPE FilmOffer Given15,300,000-16,670,000965-1,051Cash In Advance
ThailandLDPE FilmOffer Received15,600,000-15,700,000984-99030 Days Credit Term
CanadaLLDPE Film C4Offer Received15,500,00097730 Days Credit Term
IndonesiaLLDPE Film C4Buy Idea9,000,000-13,180,000567-831Cash In Advance
IndonesiaLLDPE Film C4Offer Given13,200,000-13,300,000832-83914 Days Credit Term
IndonesiaLLDPE Film C4Offer Given12,940,000-14,700,000816-92730 Days Credit Term
IndonesiaLLDPE Film C4Offer Given12,600,000-14,000,000794-883Cash In Advance
IndonesiaLLDPE Film C4Offer Received12,500,000-14,500,000788-91430 Days Credit Term
IndonesiaLLDPE Film C4Offer Received11,820,000-14,600,000745-920Cash In Advance
IndonesiaLLDPE Film C4Price List13,850,00087330 Days Credit Term
IndonesiaLLDPE Film C4Price List12,780,000-14,800,000806-933Cash In Advance
IndonesiaLLDPE Film C4Purchased12,900,000-14,730,000813-92930 Days Credit Term
IndonesiaLLDPE Film C4Purchased11,820,000-13,500,000745-851Cash In Advance
MalaysiaLLDPE Film C4Offer Given12,300,000775Cash In Advance
MalaysiaLLDPE Film C4Offer Received13,100,000-13,600,000826-85730 Days Credit Term
MalaysiaLLDPE Film C4Offer Received11,600,000-13,800,000731-870Cash In Advance
MalaysiaLLDPE Film C4Purchased12,950,00081630 Days Credit Term
MalaysiaLLDPE Film C4Purchased11,300,000712Cash In Advance
Southeast AsiaLLDPE Film C4Offer Given13,200,000-13,300,000832-83914 Days Credit Term
Southeast AsiaLLDPE Film C4Offer Given13,100,000-14,200,000826-895Cash In Advance
Southeast AsiaLLDPE Film C4Offer Received12,910,000-14,300,000814-90230 Days Credit Term
Southeast AsiaLLDPE Film C4Offer Received11,600,000-14,300,000731-902Cash In Advance
Southeast AsiaLLDPE Film C4Price List13,450,000848Cash In Advance
Southeast AsiaLLDPE Film C4Purchased12,910,000-13,400,000814-84530 Days Credit Term
Southeast AsiaLLDPE Film C4Purchased12,100,000763Cash In Advance
ThailandLLDPE Film C4Bid Received12,000,000757Cash In Advance
ThailandLLDPE Film C4Buy Idea14,000,00088330 Days Credit Term
ThailandLLDPE Film C4Offer Given12,800,000-13,860,000807-874Cash In Advance
ThailandLLDPE Film C4Offer Received13,200,00083230 Days Credit Term
ThailandLLDPE Film C4Purchased13,200,00083230 Days Credit Term
ThailandLLDPE Film C4Sold13,500,000851Cash In Advance

Transactions for import PE in March on LC at sight, CIF Indonesia Main Port basis

OriginProductTransaction TypeOffers (USD/ton)
Southeast AsiaHDPE Blow MouldingOffer Given830-920
Southeast AsiaHDPE Blow MouldingOffer Received815-970
Southeast AsiaHDPE Blow MouldingPrice List880
Southeast AsiaHDPE Blow MouldingPurchased820-940
Middle EastHDPE FilmBuy Idea750
Middle EastHDPE FilmOffer Given770-840
Middle EastHDPE FilmOffer Received800-860
Middle EastHDPE FilmPurchased750-830
Middle EastHDPE FilmSold820*-830
North AmericaHDPE FilmOffer Received840-860**
Southeast AsiaHDPE FilmOffer Given830-920
Southeast AsiaHDPE FilmOffer Received815-870
Southeast AsiaHDPE FilmPrice List880
Southeast AsiaHDPE YarnOffer Given830-890
Middle EastLDPE FilmOffer Given880-960
Middle EastLDPE FilmOffer Received940-960
Middle EastLDPE FilmSold940-960
Southeast AsiaLDPE FilmOffer Given980-1,030
Southeast AsiaLDPE FilmOffer Received965-1,030
Southeast AsiaLDPE FilmPrice List980
Southeast AsiaLDPE FilmPurchased1,010
Indian SubcontinentLLDPE Film C4Offer Given830
Middle EastLLDPE Film C4Buy Idea750
Middle EastLLDPE Film C4Offer Given770-860
Middle EastLLDPE Film C4Offer Received790-870
Middle EastLLDPE Film C4Purchased800-880
Middle EastLLDPE Film C4Sold*820-830
North AmericaLLDPE Film C4Bid Given680
North AmericaLLDPE Film C4Buy Idea670
North AmericaLLDPE Film C4Offer Given830
North AmericaLLDPE Film C4Offer Received770***-810
Southeast AsiaLLDPE Film C4Bid Given720
Southeast AsiaLLDPE Film C4Offer Given810-870
Southeast AsiaLLDPE Film C4Offer Received805-860
Southeast AsiaLLDPE Film C4Purchased810
Southeast AsiaLLDPE Film C4Sold810-820
Southeast AsiamLLDPE C6Offer Given920
Southeast AsiamLLDPE C6Offer Received1,160
Description: *ETA May **Available in Port Klang ***Available in Singapore

Tags: Asia Pacific,English,Indonesia,PE,Quarterly,SEA

Published on April 12, 2020 6:39 PM (GMT+8)
Last Updated on April 12, 2020 6:59 PM (GMT+8)